mac makeup while Beach Volleyball
3. on political theory and the theory of market economy, study, research was not thorough enough, is not comprehensive enough, stay in the little understood. Many problems to listen to the views of others, there is no system of independent discussion, let alone a full complement. overall concept has to be strengthened, the entire park project management plan is not perfect, a lot of things sake of discussion, discuss insanity workout a single project, professional and technical operation of the skilled, unified large-scale operation, the overall linkage of the forward-looking should be further expanded and strengthened, that is, expand thinking, contrarian, play construction initiative, the leading role. to further improve the relevant departments to take the world business problems, give full play to the grassroots sector, grass-roots units of the centripetal force of cohesion, solidarity, hard work, good service for the grassroots units.
in 2010 a few of my work, study them at their own north face denali , but also in the new year I try to overcome them, identify new targets, establish a new starting point for the prominent place, into my initial ideas in mac brushes are as follows:
continue to do political theory, market economy and the business level of learning, improve their quality, especially the perceived study, implementation of the A Pair of responsibility in accordance with the requirements of building within the competence of risk prevention platform. .2011 in June to complete the main stadium project's Beach Volleyball preliminary survey, design, bidding. Completed in mac makeup while Beach Volleyball Grand Slam in front of the main stadium maintenance and repair work started immediately after the actual operation of the stamp project, completed in one year and strive to provide the next season of use. In the winter of 2010 started the badminton hall film based on the premise of the project, completed in spring 2011, major construction of the project content, while supporting the completion of gas supply and installation of power transformers.